BRIDGE PROJECTS

Click on any project description for further information.

Crescent Street Bridge Replacement in Athol, MA

 

Replacement of Mirimichi Street Bridge in Plainville, MA

Replacement of Blanchard Sawmill Culvert in Scituate, RI

Beaver Street Bridge Replacement over Beaver Dam Brook in Framingham

 

Rehabilitation of Four Housatonic Railroad Bridges in Kent, Canaan & New Milford, CT

Falmouth Secondary Track Culvert Replacement in Bourne

Memorial Avenue (Rt 147) Bridge Replacement over the Westfield River in Agawam & West Springfield

Replacement of Chapel Street Bridge Superstructure in the Town of Lee

Bridge Replacement Valley Street over the Housatonic River in the Towns of Lee and Lenox

Repair and Replacement of Housatonic Railroad Bridges in the Towns of Lenox and Pittsfield

Replacement of the Railroad Avenue Bridge in the Town of Burrillville, RI

Removal & Replacement of the Simmonsville Ave. Bridge in Johnston, RI.

Replacement of the North Royalston Road Bridge in Winchendon, MA

Rehabilitation of Bridge No. 05579 Route 190 over Terry Brook in the Town of Enfield

ConnDOT-2017

Tri-Community Bikeway & Pedestrian Bridge Construction in the Municipalities of Stoneham, Winchester & Woburn

MassDOT – 2017/2018

Wickaboag Valley Road Bridge Replacement in the Town of West Brookfield

MassDOT – 2017/2018

Main Street Bridge Repairs over the East Branch of the Housatonic River in the Town of Dalton

MassDOT-2016/2017

Design Build Replacement of Arcadia Management Area Bridges in Exeter, RI

Rhode Island DOT – 2017

East Broadway Culvert Replacement

City of Haverhill – 2016/2017

Parker Street Bridge Replacement over Fort Pond Brook

Town of Acton – 2016/2017

 

Mount Vernon Street Bridge Improvements

Town of Winchester– 2016/2017

Paper Mill Road Bridge Replacement over the Weweantic River in the Town of Wareham, MA

MassDOT – 2016/2017

Knowledge Corridor- Northampton Underpass

MBTA – 2016/2017

 

Main Street Bridge Rehabilitation over the Quinebaug River in the Town of Southbridge

Massachusetts Department of Transportation – 2016-2017

Bridge Replacement in Stamford

Vermont Agency of Transportation – 2016

Needham St Bridge Replacement over Great Ditch in the Town of Dedham

Massachusetts Department of Transportation – 2015/2016

Replacement of Northbound Bridge over Tracy Road in Killingly, CT

ConnDOT – 2016/2017

Bridge Replacement Hopper Road over the Green River in the Town of Williamstown

Massachusetts Department of Transportation – 2015/2016

Winter Street Bridge Replacement over CSX & MBTA Railroads in Framingham

MassDOT – 2015 thru 2017

Rehabilitation of Route 44 (Pomfret St) Bridge over Quinebaug River in the Town of Putnam

ConnDOT – 2015/2016

Rehabilitation of a 1925 arch bridge structure including concrete repairs to arch structure as well as replacing existing parapets and sidewalks.

 

Replacement of the Woodlawn Avenue Bridge over CSX RR in Pittsfield, MA

MassDOT – 2014/2015

Construction of a new single span structure on new precast abutments and cast-in-place footings.

 

Kingston Station RR Bridge No. 372 Concrete Beam Repairs

Rhode Island DOT – 2014/2015

Repair/reconstruction of existing concrete superstructure and substructure.

 

Rehabilitation of the Willow Street Bridge over the Housatonic River

Town of Lee – 2014/2015

Partial demolition and reconstruction of a steel truss bridge.

 

Water Street Bridge Replacement

Town of Plymouth– 2014/2015

Removal of the existing single-span bridge and weir over Town Brook in downtown Plymouth and replacement with a new single-span bridge and rock ramp-style fish passage structure.

 

Roadway Reconstruction and Related Work on Liberty St including Replacement of Two Culverts in Danvers, MA

MassDOT – 2014

Demolition of existing culverts and installation of new precast box culverts, wingwalls, installation of temporary utility bridge for utility operations during construction, vibration monitoring of adjacent dwellings, steel sheeting installation for support of excavation and dewatering operations, causeway rehabilitation including surcharge loading and slope rehabilitation. 

 

Rehabilitation of the Willimansett Bridge over the Connecticut River & Pioneer Valley Railroad in the Cities of Chicopee & Holyoke

Massachusetts Department of Transportation– 2014/2015

Rehabilitation through the replacement of the bridge deck, sidewalks, and historic metal bridge railings. The existing bridge support structure will be repaired and strengthened as well as the piers and abutments and all structural steel will be repainted.

 

Bridge Replacement on Putnam Road over Town Brook in the Town of Lanesborough, MA

Town of Lanesborough, MA – 2014

This project included the demolition of existing arch culvert, stream diversion, installation of new aluminum arch culvert and wing walls, river bank remediation/scour protection, roadway and safety improvements.

Main Street (Rt 122) Bridge Reconstruction over the Blackstone River in the Town of Blackstone

Massachusetts Department of Transportation – 2014/2015

Rehabilitation of an arch bridge involving new cast-in-place wingwalls, footings and arch extensions to widen bridge and roadway.

 

Culvert Replacement at Comins Road over the French River in the Town of Oxford

Massachusetts Department of Transportation – 2014

Replacement of the bridge carrying Comins Road over the French River.

 

Depot Street Bridge Superstructure Replacement in the Towns of Monroe and Rowe

Massachusetts Department of Transportation – 2014

Demolition of the existing bridge superstructure and construction of a new single span vehicle and pedestrian prefabricated steel through truss with floor beams and stringers.

 

Rehabilitation of I84 EB & WB Bridges over Marion Avenue in Southington

Connecticut Department of Transportation – 2013/2014

Rapid Bridge Construction Project consisting of removing and replacing two 102’ long by 57’ wide bridge superstructures over a 56 hour period.

Rehabilitation of I-385 Bridge over Moosup Pond Road in Plainfield

Connecticut Department of Transportation – 2013

Project involved jacking bridge 1 foot and reopening to live traffic.  Replacing all bridge bearings and a girder and section of deck damaged by a truck.  Entire bridge deck was waterproofed and paved.

 

Charlemont - Route 2 Culvert Replacement (Concrete) over Hartwell Brook

Massachusetts Department of Transportation – 2013

Demolition and removal of the existing culvert, construction of a single span precast reinforced concrete arch structure.

 

Bennington Bridge Reconstruction

Vermont Agency of Transportation – 2013

Construction of retrofit micro pile foundations for both piers of existing three span continuous rolled beam bridge over the Roaring Branch of the Walloomsac River.

 

West Hartford Bridge Rehabilitation Oakwood Avenue over I-84

Connecticut Department of Transportation – 2013

Demolition of existing superstructure and construction of a two-span continuous, multi-girder, high strength weathering steel superstructure with a composite concrete deck. Modifications of pier and abutments to accommodate the raised height of the superstructure. The structure will maintain the same length and width.

Union Bridge Replacement Route 190 over I-84

Connecticut Department of Transportation – 2013

Demolition of existing superstructure and construction of a two-span continuous, multi-girder, high strength weathering steel superstructure with a composite concrete deck. Modifications of pier and abutments to accommodate the raised height of the superstructure. The structure will maintain the same length and width.

Oak Hill Avenue Culvert Replacement

City of Pittsfield – 2013

Replacement of existing culvert and headwalls with new reinforced precast concrete box culvert and headwalls and all associated work.

 

Bridge Superstructure Replacement Route 10 over the Manhan River in Easthampton

Massachusetts Department of Transportation – 2013

Demolition of the existing single span deck steel girder bridge and construction of new single span structure consisting of pre-stressed precast concrete deck bulb tee beams with integral deck.

 

Wood Street over Cole River Bridge Reconstruction Project

Town of Swansea – 2012

Replacement of the existing structure with a three sided precast culvert with precast legs supported on cast-in-place concrete pedestals and spread footings.

 

East Bridge - River Road Bridge Replacement

Town of Killingly, CT – 2012

Replacement of existing bridge over the Five Mile River with steel truss bridge. Replacement of four existing stone retaining walls with concrete retaining walls and repair of stream banks.

West Bridge - River Road Bridge Replacement

Town of Killingly, CT – 2012

Replacement of washed out bridge over the Five Mile River with a  precast, prestressed concrete bridge, concrete wing walls, concrete retaining walls as well as repairs to stream banks including riprap scour protection.

Bridge Replacement Route 2 over the Fall River in Gill- Greenfield

Massachusetts Department of Transportation – 2013

Superstructure replacement, substructure repairs to piers, abutments, wing walls and retaining walls and soil nail treatment of abutment slopes.

Rehabilitation of Stillwater Viaduct Bridge

Rhode Island Department of Transportation – 2012

Superstructure replacement on eleven span structure over Woonasquatucket River. The work involved concrete arch and substructure repair including seismic retrofits.

Replacement of Haynes Road Bridge over Hall Brook

Town of Wilmington, VT – 2012

Complete single span bridge replacement over water consisting of steel beams with cast in place abutments and deck.

Bridge Replacement and Rehabilitation in Chicopee  

Massachusetts Department of Transportation – 2013

 

Bridge Rehabilitation Route 2 over Route 112 and the Deerfield River in the Towns of Buckland & Shelburne

Massachusetts Department of Transportation – 2013

Work consisted of removing the wearing surface; replacing the concrete deck slab; removing and replacing the bridge bearings; repairing deteriorated superstructure elements and repairing the existing substructure.

 

Bridge Replacement Haydenville Rd. over West Brook, Whatley

Massachusetts Department of Transportation – 2011

Demolition existing bridge and construction of a new single span precast prestressed beam bridge founded on cast-in-place concrete abutments and wingwalls.

Bridge Rehabilitation Route 28 over Route 125 in Andover

Massachusetts Department of Transportation – 2012

Replacement of the bridge deck, including the roadway surface.

 

Franklin St Bridge - Worcester

Ragnar Benson for CSX Railroad – 2012

Construction of 100’ span new bridge over private road to accommodate truck traffic to the rail yard. 

 

Bridge Replacement Rockland Street over CSX and MBTA Railroads in Wellesley

Massachusetts Department of Transportation – 2013

Demolition of the existing superstructure and construction of new precast beam structure as well as construction of a temporary pedestrian bridge.

 

Quincy Mental Health Center Pedestrian Bridge

Massachusetts Department of Mental Health – 2012

Demolition of existing pedestrian bridge. Installation of new cast in place concrete bridge with stainless steel rails and lighting.

 

Bridge Deck Rehabilitations Liberty and Armory Streets over I- 291 in Springfield

Massachusetts Department of Transportation – 2010

Repair of the concrete bridge decks; replacement of the sidewalks and safety walks minor widening of the approaches and installing new asphalt pavement.

 

Replacement of Bridge Route 74 over Grapevine Brook in Tolland

Connecticut Department of Transportation – 2011

Construction of cast in place concrete bridge with adjacent concrete retaining walls.

 

Replacement of the Wyoming Bridges in the Towns of Richmond and Hopkinton, RI

Rhode Island Department of Transportation – 2011

Reconstruction of two historic stone bridges including installing precast superstructure.

 

Bridge Replacement Fountain Street over the CSX & MBTA Railroads in Framingham

Massachusetts Department of Transportation – 2011

Demolition and replacement of the entire existing superstructure and portions of the substructure with a 83’ long single span bridge.

 

Wachusett Greenways/MCRT Culvert Under Route 56 in Rutland

Wachusetts Greenways – 2011

Installation of a precast concrete box culvert and appurtenances along the Massachusetts Central Rail Trail (MCRT) under Pommogussett Road (Rt 56).

 

.

Memorial Avenue (Rt 147) Bridge Replacement over the Westfield River in Agawam & West Springfield