Highway

Utility

Site

Construction of Harbor Front Walkway and Causeway Park along the Danvers River in Beverly & Salem

MassDOT – 2015/2016

Construction of a walkway along the Beverly Harbor Front under a section of the Veterans Memorial Bridge (Route 1A) and a park along an abandoned section of the former Route 1A between Bridge Street and the Danvers River.